SIET adopted  140 KVA Grid connected rooftop solar power plants and decentralized solar application scheme sponsored by The Vasista educational society, Seetharampuram. The solar power panels are place rooftops of the entire SIET as under.

 

S. No. BLOCK TOTAL USE OF RENEWABLE ENERGY
1 SIET OFFICE BLOCK 50KVA
2 PLACEMENT CELL BLOCK 30KVA
3 EEE BLOCK 30KVA
4 MBA BLOCK 30KVA
                                             TOTAL  140KVA

 

 